Proposed Intersection improvements – Bayfield Rd, Galston
This project involves upgrading the existing intersections at each end of Bayfield Road through realignment, sealing of road pavement and installing new line marking and signs. The aim of this project is to improve road safety. The works are anticipated commence in late January 2025 and take approximately two to three weeks dependant on the weather. Some minor traffic delays maybe incurred during construction however, appropriate traffic control measures will be implemented to minimise disruption. Consultation for this project was undertaken by the Local Traffic Committee (LTC) some years ago (2018).
Documents
- Preliminary engineering drawings (PDF 3.9MB)
- Review of Environmental Factors (REF) (PDF 6.6MB)
Enquiries
- Simon Comish. Ph: 9847 6877 (Project Designer)
- Radek Zarzycki. Ph: 9847 6524 (Senior Traffic Engineer)
- Alex Chen Ph: 9847 6071 (Construction Engineer)